Overview
Loading…
Active Projects
All Projects
Click a project to view its dashboard
← Back to Projects
Overview
🗂️ Board
📦 Resources
Changes
RFIs
⚠️ Risk Tickets
💰 Variations
Records
Daily Diary
📋 Daily Sheets
🛡️ H&S
Anonymous Feedback
Feedback submitted by operatives across all projects
Health & Safety
Accidents, near misses and risk tickets across all projects
Workforce
Allocate workers to projects — drag between sites and gangs
Plant & Assets
One register for every machine and small-plant item — owned or hired. Drag onto a site to allocate; gangs can only pre-start allocated plant.
Request for Information
All open and closed RFIs across every project
DateProjectGangQuestionUrgencyStatus
Project Changes
Acknowledgement status by gang for every active change
New Employee
Personal Details
Employment
Bank Details
Issue Warning
✏️ The worker will read this message when they receive their warning. Please check spelling and wording carefully before submitting.
⏳ Approval required. This warning will be held for review. A director or manager must approve it before it is logged on the worker's record and the worker is notified.
Risk Register
Risk ticket log across all projects — open, resolved and escalated
0 tickets selected
Variations
Compensation Events and commercial variations across all projects
Reports
Daily diary reports — accumulated and published per project
New Project
Set up a new DGC project
Step 1 of 7
Project Identity
Basic details — these appear across all documents, cards, and reports.
Six-digit project number used in all filenames and records.
Select all that apply — this tailors the rest of the setup. Drawings, manholes and pins only appear for excavation; the adoption step only appears for adoptable drainage.
Adoption Status
Determines which compliance specifications govern this project.
MSFA always applies to manhole chamber construction on Isle of Man projects. It governs chamber types, ring sizes, benching, and channel dimensions.
Always Active Manx Sewers for Adoption

If the tender included additional specifications or employer's requirements, upload them here. They will be stored in SharePoint and used by the AI scope assistant.

📄
Drop specification documents here
PDF, Word, or Markdown · Optional
    Import Drawings
    Upload project drawings — manhole schedules, pipe runs, and design levels are extracted automatically.
    What happens when you upload a drawing?
    The system reads each drawing and builds a structured data file behind the scenes. This means manhole depths, pipe gradients, and invert levels are available to every part of the DGC OS — excavation cards, trench records, and the site app — without you entering them manually.
    📐
    Drop drawing files here, or click to browse
    PDF, DWG, or DXF accepted
      Scope of Works
      Describe what is included in this project.

      This description helps the DGC OS understand the project — it is used by the AI assistant when generating RAMS, programmes, and reports. Speak or type freely; you can tidy it up afterwards.

      Click to speak

      If you have a written scope, employer's requirements, or tender description, upload it here. It will be stored in SharePoint and used by the AI scope assistant alongside your description above.

      📋
      Drop scope documents here
      PDF or Word · Optional

        Upload the project BoQ. This will be stored in the Commercial folder and used for cost tracking and valuation. The architect can view cost data; site team cannot.

        💷
        Drop BoQ here
        PDF, Excel, or CSV · Optional
          Reference Pins
          Surveyed datum levels used on site. Operatives set out and measure work relative to these — dig depths, invert levels, finished floor/surface levels. Levels are in metres OD.
          Each pin is a coloured marker at a surveyed level. Work is quoted relative to a pin (e.g. excavation "depth below pin colour", slab level "above pin"). Pins are usually set out once the gang is on site.
          Pin ColourLevel (m OD)Location / Notes
          Site Team & Resources
          Set up the gang structure and plant. Crew is allocated in the Workforce tab once the project is created.
          NameRoleEmail
          The named PM appears on this project's inductions, permits and reports. 👷 Crew and the site manager are assigned in the Workforce tab after the project is created.
          Each gang logs in from a shared tablet. Multiple gangs can work simultaneously on the same project.
          Gang IDForemanPrimary Plant

          Plant that is shared between gangs or moves between teams. Gangs can be assigned to these from the site app.

          TypeItemReg / IDNotes

          Standard day rates for this project. Used in timesheets and variation orders.

          Review & Publish
          Check everything below before publishing. Click any step to go back and edit.
          Site App
          Gang operative app — site diary, RFIs, H&S, signatures and daily records
          📱 DGC Site App
          The site app is used by gangs on site to record daily progress, submit RFIs, log incidents, capture signatures, and take site photos.

          It is designed for use on mobile and tablet. Each gang logs in with their gang code and works through their active project from the field.
          Web & SEO
          Loading posts…
          Connecting…
          Live Posts
          Published posts on the DGC website

          Loading…

          ← Back to Posts
          New Post
          Write, optimise and publish to the DGC website
          ① Post Details
          ② Images
          Paste a direct image URL. Leave blank for no image.
          Or attach local photos (for reference — not uploaded):
          ③ Category & Tags
          Comma-separated. New tags created automatically.
          ④ SEO
          Controls how this post appears in Google search results.
          ⑤ Publish
          Leave blank to auto-generate.
          Drafts
          AI-generated posts ready for review, editing and publishing
          💾

          No drafts yet.
          Generate a post from From Report to get started.

          For Review
          Posts awaiting director authorisation before going live
          📝 Blog Posts for Approval
          🔍

          Nothing awaiting review.
          Posts submitted for authorisation will appear here.

          📘 Facebook Posts
          Photos submitted from the site diary appear here with an AI-generated caption. Approve to publish directly to the DGC Facebook page. Published posts are shown below for reference.
          📘

          Loading Facebook posts…

          SEO Audit
          Scores every published post on on-page SEO factors
          Import from Report
          Push reports from the OS or upload a PDF — AI reads and structures it for you
          From OS — Pushed Reports
          Reports sent via the ✍️ Blog button in the OS Reports tab appear here, already tagged with project and date.
          📋

          No reports pushed from OS yet.
          Go to OS → Reports and click ✍️ Blog on any report.

          🤖 AI Blog Suggestions AUTO
          When the AI weekly survey identifies a strong angle, it creates a suggestion here. Click any card to generate that post.
          💡

          No suggestions yet — run the AI survey first.

          Source Documents
          Upload Source Document
          Upload a report, news article, document or certificate (PDF) — Claude AI will read it and extract the key information.
          📰 Import from URL
          Paste a news article or web page URL — AI will extract the content and add it to the source queue as a blog card.
          🤖 AI Intelligence
          DGC data the AI has learned — updated every 7 days to improve post quality.
          Loading…
          Write a Story
          Dictate or type a brief — AI builds a professional, SEO-ready blog post
          Story Brief
          Click to speak your brief
          Dictated text is appended to your brief above. Works in Chrome and Edge.
          Story Ideas
          🚜
          Plant InvestmentAnnounce a new machine — what it is, its capacity, why it was chosen, and what it enables on future projects.
          👷
          New HireIntroduce a new team member — their role, experience, and what they bring to the DGC team.
          🏆
          MilestoneA contract win, first phase completion, accreditation achieved, or years in business worth celebrating.
          🏗️
          Project UpdateA notable phase completion, design challenge overcome, or client outcome on a specific project.
          📰
          Company NewsA partnership, supplier relationship, new certification, or industry development that's relevant to DGC.
          💡 Be specific. Names, figures, dates and direct quotes make the post feel real. AI will wrap professional language around the facts you provide.
          HR
          Staff profiles, qualifications, holiday and pay
          Workforce
          Worker pool, team builder and recruitment pipeline
          Workers
          Docs Complete
          Active Jobs
          In Pipeline
          Loading workers…
          ✨ Create Job with AI
          Describe the role in plain English — AI will generate a ready-to-publish listing.
          Loading jobs…
          📋 Job Applicants 0
          📩 Applied
          ⭐ Shortlisted
          💬 Interview
          ✅ Offered
          🚦 Started
          🏗️ Project Placements 0
          👋 Interested
          📨 Outreached
          ✅ Confirmed
          🚦 On Site
          Track workers who refer new candidates. Pay bonuses when the referral is hired and completes their probation.
          Loading referrals…
          Logistics
          Material & tool requests, warehouse inventory and supplier accounts
          Requests
          PPE Issues
          Warehouses
          Merchants
          Warehouse
          Overview
          Stock
          Checked Out
          Movements
          Minor Works
          Loading…
          Check Out Item
          Add Item to Inventory
          Deleting…
          Messages
          Loading…